Tilt up construction scope gaps, and where the shell packages stop
Tilt up construction scope gaps appear at the panel joints, the embeds and the perimeter, where three packages meet and each assumes another closes it.
The gaps between trade packages, and drawings that disagree with the specification.
Tilt up construction scope gaps appear at the panel joints, the embeds and the perimeter, where three packages meet and each assumes another closes it.
A warehouse slab tolerance specification is a number that decides whether the racking works. Getting it wrong is discovered after the concrete has cured.
Phased construction occupied healthcare facility work depends on swing space and decant dates, and both of those belong to the owner, not the builder.
Medical equipment construction coordination fails on timing rather than on drawing. The room is built before the machine that defines it has been selected.
Owner furnished equipment construction risk is not about the equipment. It is the five items around it that no trade package claims by name.
Podium construction cost risk sits at one level, where a residential grid lands on a parking grid and every discipline changes direction at once.
Core and shell scope gaps open at the line between base building and tenant work, because that line is described twice and drawn properly by neither.
A drawings vs specification conflict in construction is priced by whoever saw it first. The order of precedence clause decides the argument that follows.
Clash detection vs constructability review is a question of what gets tested. One compares geometry. The other reads scope descriptions against drawings.
Scope gaps between trade packages appear in the same six places on almost every job. Each one is a change order waiting for somebody to notice it first.